Skip to content

LESCO 3.5MW Hybrid Energy Project (ESRES – UKAID)

Commissioning Date:

2021/03

Location:

Lascanod, Somalia

Power:

1400kWp + 400kWp refurb (3500kWac system upgrade)

System type:

Ground mount, Hybrid Utility Supply System

Solar modules:

3220 x 435 Wp Longi Solar
Inverters 16 x Ingeteam Ingecon Sun 100TL

Description:

Design, supply, install and assist operations and monitoring of a 3.5MW Hybrid energy facility.  Engineer, procure and construct a A) 1.4MWp solar PV plant B) Refurbish 400kWp solar PV plant, C) integrate 2 x old PV plants of 250kWp each. D) 3.5MVA step up transformer E) Low voltage synchronisation distribution board for 5 generators and 6 solar PV plant inputs to connect, with future battery system. F) Full control and monitoring system

Back To Top